| 71 |
Construction of Plant Integrated Material Management System |
R&D
|
|
2009.01~2009.12 |
The final goal
- Construction of Commodity Code, Geometric Code, Ident Code of electricity and instrument - Generation and management of BOM, E/R of electricity and instrument - Interface between SP3D, TOPICS, WIT and Procurement Management System - Realization of electricity and instrument report
|
| 70 |
Construction of Integrated 3D Design System and Application to Business |
R&D
|
|
2009.01~2009.12 |
The final goal
Production of outcome (drawings/Bill Of Material) through “3D Model-centered Design” in all areas and the first application of SP3D to practical business in Korea
|
| 69 |
Project Collaboration and Material Inspection System Upgrade |
R&D
|
|
2009.01~2009.12 |
The final goal
- Document Repository System construction of other system - Reinforcement of project collaboration and report function
- Review of construction technology of Center Stage Based Next Generation Collaboration System - Construction of PS for Site System - Construction of Material Testing Collaboration System - Construction of Business Quality Check-up System
|
| 68 |
Smart Plant Enterprise Solution Consulting |
R&D
|
|
2009.01~2009.12 |
The final goal
- Solving problems of applying allied product family to practical business and expanding application
|
| 67 |
Management and Integration of Design Data |
R&D
|
|
2009.01~2009.12 |
The final goal
- Maximization of utilizability of Schematic Design Solution - Maintenance of data consistency between solution and performance
|
| 66 |
Construction of Integrated Construction and Testing Management System |
R&D
|
|
2009.01~2009.12 |
The final goal
- Construction and application of integrated construction Information Management System - Construction and application of construction quality and QC inspection - Realization and application of HPCM Web system - Realization and application of Punch management system
|
| 65 |
Development of Power Generating Technology Using 50kW Oxyfuel Combustion |
R&D
|
|
2008.04~2012.03 |
The final goal
Development of power generating technology using high-pressure oxyfuel combustion - Capacity: 50kW (turbine power generation) - Fuel: Natural gas - 연소압력: 고압연소(5bar 이상) - Combustion pressure: High-pressure fuel (more than 5bar) - More than 90% of CO2 concentration among exhaust gas
|
| 64 |
Research on Design Criteria of CO2 Collection Process Using Ammonia Water |
R&D
|
|
2009.03~2009.03 |
The final goal - Development of design technology for scale-up of CO2 collection - Detailed design, production and installation of pilot plant (500 Nm3/h) - Process Design Package 개발 (100~200 MW) - Development of Process Design Package (100~200 MW)
|
| 63 |
Development of Advanced Lake Water Quality Treatment System |
R&D
|
|
2008.02~2010.06 |
The final goal
- Review of effectiveness of the business by conducting the pilot project of water quality improvement project in Bunam-ho (Bunam Lake) and applying to similar locations (locations -> sites)
- Efficiency and performance verification of HAAS as a lake water quality improvement method
- Obtaining intellectual property (Plan on designation and verification of patent and new environmental technology)
|
| 62 |
Engineering Data Integration using Aspen Zyqad |
chemical
|
|
2008.01~2009.12 |
The final goal - Mastering the technology applying Zyqad - Procure the technology of establishing Zyqad Database - Building database at ongoing project applying Zyqad
|
|